The mission of 2014
-
Drilling technicians on the airport in Port-au-Prince (May 2014) Drilling technicians on the airport in Port-au-Prince (May 2014)
-
Road connecting the capital Port-au-Prince with Gonaives (May 2014) Road connecting the capital Port-au-Prince with Gonaives (May 2014)
-
Road above Baie-de-Henne in department Nord-Ouest (May 2014) Road above Baie-de-Henne in department Nord-Ouest (May 2014)
-
Huts on the edge of fishing village Baie-de-Henne (May 2014) Huts on the edge of fishing village Baie-de-Henne (May 2014)
-
A house in Rivierre Henne village seen from the road (May 2014) A house in Rivierre Henne village seen from the road (May 2014)
-
Drilling well Maya in Nan Vincent village: first meters are drilled by twist drill (June 2014) Drilling well Maya in Nan Vincent village: first meters are drilled by twist drill (June 2014)
-
Inhabitants of Nan Vincent village watching the drilling operations (June 2014) Inhabitants of Nan Vincent village watching the drilling operations (June 2014)
-
Technician Marek Domes repairing the end of hydraulic hose (June 2014) Technician Marek Domes repairing the end of hydraulic hose (June 2014)
-
Drilling well Maya in Nan Vincent village (June 2014) Drilling well Maya in Nan Vincent village (June 2014)
-
Fuelling the compressor with diesel, Nan Vincent (June 2014) Fuelling the compressor with diesel, Nan Vincent (June 2014)
-
Welding a part of the steel shoring preserving the upper part of the borehole from collapsing (June 2014) Welding a part of the steel shoring preserving the upper part of the borehole from collapsing (June 2014)
-
Children awaiting the outcome of drilling works, Nan Vincent (June 2014) Children awaiting the outcome of drilling works, Nan Vincent (June 2014)
-
Landscape around Jean Rabel, Nord-Ouest (June 2014) Landscape around Jean Rabel, Nord-Ouest (June 2014)
-
A donkey: the most common mean of transportation in the countryside (June 2014) A donkey: the most common mean of transportation in the countryside (June 2014)
-
Due to damage of its diesel generator, the drilling rig was temporarily driven by hydraulic pump from Praga truck, Nan Vincent (June 2014) Due to damage of its diesel generator, the drilling rig was temporarily driven by hydraulic pump from Praga truck, Nan Vincent (June 2014)
-
Service of Praga truck in Nan Vincent (June 2014) Service of Praga truck in Nan Vincent (June 2014)
-
Drilling foreman Václav Papež with his apprentices (June 2014) Drilling foreman Václav Papež with his apprentices (June 2014)
-
Drilling works in Nan Vincent (June 2014) Drilling works in Nan Vincent (June 2014)
-
Removing steel shoring after piping the drill up with plastic tubes, Nan Vincent (June 2014) Removing steel shoring after piping the drill up with plastic tubes, Nan Vincent (June 2014)
-
Road from Jean Rabel to Mare Rouge, department Nord-Ouest (July 2014) Road from Jean Rabel to Mare Rouge, department Nord-Ouest (July 2014)
-
Road from Jean Rabel to Mare Rouge, department Nord-Ouest (July 2014) Road from Jean Rabel to Mare Rouge, department Nord-Ouest (July 2014)
-
Our technician Jean Apllyrs with a drill in Nan Vincent (July 2014) Our technician Jean Apllyrs with a drill in Nan Vincent (July 2014)
-
On-site service of a reduction gear, Bombardopolis (July 2014) On-site service of a reduction gear, Bombardopolis (July 2014)
-
On-site service of a reduction gear, Bombardopolis (July 2014) On-site service of a reduction gear, Bombardopolis (July 2014)
-
Drilling the well Monica in Bassin Hardy near mountain village Ti Riviere: preparation works (July 2014) Drilling the well Monica in Bassin Hardy near mountain village Ti Riviere: preparation works (July 2014)
-
Preparations for drilling the well Monica in Bassin Hardy: equilibrating the drilling rig in a horizontal position (July 2014) Preparations for drilling the well Monica in Bassin Hardy: equilibrating the drilling rig in a horizontal position (July 2014)
-
Drilling Monica well in Bassin Hardy near mountain village Ti Riviere (July 2014) Drilling Monica well in Bassin Hardy near mountain village Ti Riviere (July 2014)
-
Removing steel shoring after the first unsuccessful trial to drill a borehole for the well Monica, Bassin Hardy (July 2014) Removing steel shoring after the first unsuccessful trial to drill a borehole for the well Monica, Bassin Hardy (July 2014)
-
Original water source in Soices Moual village near Mare Rouge town – now, there is the well Francis is located nearby (July 2014) Original water source in Soices Moual village near Mare Rouge town – now, there is the well Francis is located nearby (July 2014)
-
Concreting well Maya with the basement for the pump Nan Vincent (July 2014) Concreting well Maya with the basement for the pump Nan Vincent (July 2014)
-
Installing pump to the Maya well, Nan Vincent (July 2014) Installing pump to the Maya well, Nan Vincent (July 2014)
-
Opening the well Francis, Soices Moual (August 2014) Opening the well Francis, Soices Moual (August 2014)
-
Francis well, Soices Moual (August 2014) Francis well, Soices Moual (August 2014)
-
Steel shoring: the second trial to drill a borehole for Monica well, Bassin Hardy (August 2014) Steel shoring: the second trial to drill a borehole for Monica well, Bassin Hardy (August 2014)
-
Detail PVC trubky tvořící pažení hotového vrtu a ocelové pažnice, která bude vyjmuta (srpen 2014) Detail PVC trubky tvořící pažení hotového vrtu a ocelové pažnice, která bude vyjmuta (srpen 2014)
-
Releasing stuck steel tubes (August 2014) Releasing stuck steel tubes (August 2014)
-
Removing the steel tube with crane, Bassin Hardy (August 2014) Removing the steel tube with crane, Bassin Hardy (August 2014)
-
Monica well right after it was opened, Bassin Hardy (August 2014) Monica well right after it was opened, Bassin Hardy (August 2014)
-
First users of Monica well, Bassin Hardy (August 2014) First users of Monica well, Bassin Hardy (August 2014)
-
First operation of the Monica well, Bassin Hardy (August 2014) First operation of the Monica well, Bassin Hardy (August 2014)
-
New location for a future drill which is to be made in the Pechon village right next to the school (August 2014) New location for a future drill which is to be made in the Pechon village right next to the school (August 2014)
-
School in Pechon (August 2014) School in Pechon (August 2014)
Zobrazit fotogalerii na:
http://www.praga-haiti.cz/gallery-en/the-mission-of-2014#sigProId8c534cb296
http://www.praga-haiti.cz/gallery-en/the-mission-of-2014#sigProId8c534cb296