The autumn mission in 2012
- Drilling foreman Bohumil Sumpela with a new helper overseeing a checklist in the repair pit, Bombardopolis (October 2012) Drilling foreman Bohumil Sumpela with a new helper overseeing a checklist in the repair pit, Bombardopolis (October 2012)
- Complex service works at the beginning of every mission, Bombardopolis (October 2012) Complex service works at the beginning of every mission, Bombardopolis (October 2012)
- Buying oil in Port-de-Paix (October 2012) Buying oil in Port-de-Paix (October 2012)
- Checking the area where is currently located the Martine well, Burg by Bombardopolis (October 2012) Checking the area where is currently located the Martine well, Burg by Bombardopolis (October 2012)
- Accommodation in the rectory in Bombardopolis (October 2012) Accommodation in the rectory in Bombardopolis (October 2012)
- Drilling well Ivy in Clenette near Bombardopolis (October 2012) Drilling well Ivy in Clenette near Bombardopolis (October 2012)
- Drilling well Ivy in Clenette near Bombardopolis (October 2012) Drilling well Ivy in Clenette near Bombardopolis (October 2012)
- Road to Bebe by Bombardopolis, location of our well Renata (October 2012) Road to Bebe by Bombardopolis, location of our well Renata (October 2012)
- PVC shoring of the well Renata, Bebe by Bombardopolis (October 2012) PVC shoring of the well Renata, Bebe by Bombardopolis (October 2012)
- Field repair the front axle of the Praga V3S multipurpose truck, Savane Mole (October 2012) Field repair the front axle of the Praga V3S multipurpose truck, Savane Mole (October 2012)
- Preparations for drilling well Fanka in Carrenage by Mole Saint-Nicolas (October 2012) Preparations for drilling well Fanka in Carrenage by Mole Saint-Nicolas (October 2012)
- Drilling the Fanka well – tightening the joint of drilling bars, Carrenage by Mole Saint-Nicolas (October 2012) Drilling the Fanka well – tightening the joint of drilling bars, Carrenage by Mole Saint-Nicolas (October 2012)
- Drilling the Fanka well – drilling hammer taken to the surface, Carrenage by Mole Saint-Nicolas (October 2012) Drilling the Fanka well – drilling hammer taken to the surface, Carrenage by Mole Saint-Nicolas (October 2012)
- Drilling the Fanka well – cleaning crushed soil from the borehole, Carrenage by Mole Saint-Nicolas (October 2012) Drilling the Fanka well – cleaning crushed soil from the borehole, Carrenage by Mole Saint-Nicolas (October 2012)
- Drilling works in Calvaire by Mole Saint-Nicolas were cancelled as the unstable soil was blocking the drilling hammer (October 2012) Drilling works in Calvaire by Mole Saint-Nicolas were cancelled as the unstable soil was blocking the drilling hammer (October 2012)
- European team members after our evening meeting, (from the left: Jan Kominek, Jan Dvoracek, Filip Hlasny and Bohumil Sumpela), Bombardopolis (October 2012) European team members after our evening meeting, (from the left: Jan Kominek, Jan Dvoracek, Filip Hlasny and Bohumil Sumpela), Bombardopolis (October 2012)
- Application of water and detergent for stabilisation of the subsoil, Reval by Mole Saint-Nicolas (November 2012) Application of water and detergent for stabilisation of the subsoil, Reval by Mole Saint-Nicolas (November 2012)
- Technician Filip Hlasny releasing stuck drill string with help of crane, Reval by Mole Saint-Nicolas (November 2012) Technician Filip Hlasny releasing stuck drill string with help of crane, Reval by Mole Saint-Nicolas (November 2012)
- Local boys watching our drill operators, Reval by Mole Saint-Nicolas (November 2012) Local boys watching our drill operators, Reval by Mole Saint-Nicolas (November 2012)
- Leisure time of our drilling foreman Bohumil Sumpela: fixing a seesaw close to a school in Bombardopolis (November 2012) Leisure time of our drilling foreman Bohumil Sumpela: fixing a seesaw close to a school in Bombardopolis (November 2012)
- Road to fishing village La Plateforme located in the South from Bombardopolis (November 2012) Road to fishing village La Plateforme located in the South from Bombardopolis (November 2012)
- Drilling operations in the fishing village La Plateforme (November 2012) Drilling operations in the fishing village La Plateforme (November 2012)
- Service of the engine of the Praga V3S truck requires methodological manual containing a list of spare parts, Bombardopolis (November 2012) Service of the engine of the Praga V3S truck requires methodological manual containing a list of spare parts, Bombardopolis (November 2012)
- Drilling works between cactuses in the area of Non Chachat village (November 2012) Drilling works between cactuses in the area of Non Chachat village (November 2012)
- Inhabitants of the Non Chachat village (November 2012) Inhabitants of the Non Chachat village (November 2012)
- Even though people of this arid land need water, neither the second try was successful: there was salty water in the borehole, Non Chachat (November 2012) Even though people of this arid land need water, neither the second try was successful: there was salty water in the borehole, Non Chachat (November 2012)
- When it gets dark, drilling operations in Des Forges by Bombardopolis continue under artificial lighting (November 2012) When it gets dark, drilling operations in Des Forges by Bombardopolis continue under artificial lighting (November 2012)
- Concreting Martine well in Burg by Bombardopolis (November 2012) Concreting Martine well in Burg by Bombardopolis (November 2012)
- Preparing the pump to be installed into the borehole of the well Renata, Bebe by Bombardopolis (November 2012) Preparing the pump to be installed into the borehole of the well Renata, Bebe by Bombardopolis (November 2012)
- Local people helping with installation of pump Vergnet onto the Renata well, Bebe by Bombardopolis (November 2012) Local people helping with installation of pump Vergnet onto the Renata well, Bebe by Bombardopolis (November 2012)
- Handing the well Martina to the local community in Burg by Bombardopolis (November 2012) Handing the well Martina to the local community in Burg by Bombardopolis (November 2012)
- Ford on the road close to Bas Pinal in the department Nord (December 2012) Ford on the road close to Bas Pinal in the department Nord (December 2012)
- School in an orphanage, location of our well Zdislava, Bas Pinal (December 2012) School in an orphanage, location of our well Zdislava, Bas Pinal (December 2012)
- Repairing wheel of the compressor on a road close to Bombardopolis (December 2012) Repairing wheel of the compressor on a road close to Bombardopolis (December 2012)
- Finished well Fanka by Carrenage by Mole Saint-Nicolas (December 2012) Finished well Fanka by Carrenage by Mole Saint-Nicolas (December 2012)
- Drilling well Macocha, reaching the record of 106 meters; the well is run by the Italian missionaries together with a local school, Ferme village by Ti Riviere (December 2012) Drilling well Macocha, reaching the record of 106 meters; the well is run by the Italian missionaries together with a local school, Ferme village by Ti Riviere (December 2012)